ExpiredPrimavera P6 Ver 18 Overview Course and Tutorial

FREE 29
Udemy

Note: Udemy FREE coupon codes are valid for maximum 1000 redemption only and might get redeemed in few hours. Look for "GET THIS DEAL" green button at the end of Description.
This post may have affiliate link & we may get small commission if you make a purchase.

Primavera P6 Ver 18 Overview Course and Tutorial

Requirements
  • NO
Description

Learn Primavera P6 Ver 18.8 Overview Course and Tutorial1. Lecture 1 link:lecture 1 explain P6 History, P6 Features, P6 Tools, P6 Interface, Critical Path, and CPM technique and terms2. Lecture 2 Link:How to download and Install Primavera P6 Ver,18How to download and install Primavera P6 Ver 18 and Database Configuration on your laptop and be an expert in Primavera• In this Lecture:• Installation Guideline step by step with a screenshot• Database Configuration3. Lecture 3Create Project and WBS Details4. Lecture 4 in Oracle Primavera Ver 18.8 –Activities:Adding activities and Creating Links5. Lecture 5 in Oracle Primavera Ver 18.8 –Resources:Definition of resources, types and details of the resources addition – Measurement units – Prices – Resources codes – How to classify resources to its workers, tools and equipment on the Primavera software last version Ver18.8How to create Cost accounts for activities and also resources –Adding units to resources –assigning resources and unites and calculate Costs from Units6. Lecture 6 in Oracle Primavera Ver 18.8 –Create BaselinesCreate Baseline the Baseline or Target Schedule provides a point of reference on which to measure and control the underway project. Create a Baseline copy of the schedule before the first update. This will be the target against which the project’s cost, schedule, and performance are tracked. Assign each baseline a category to define its purpose (i.e. initial planning baseline, what-if project plan baseline, mid-project status baseline, monthly update comparison baseline). Categories are created under the Admin menu, Admin Categories, Baseline Types.7. Lecture 7 in Oracle Primavera Ver 18.8 Progress UpdateUpdate the schedule regularly and compare it to the baseline to ensure that resources are being used effectively, project costs are being monitored against the original budget, that there is a knowledge of actual duration and costs in order to initiate contingency plans if  necessary.Ask the following questions when updating:· What information needs to be collected to update the project and what method(s) will be used to collect information?· Who will gather the necessary information used for the project update?· How often should the project be updated?· Are resources local or offsite?· Who will need to see the results of the update and when are these results needed?· What types of information will be generated after each update in order to communicate progress before the next update period?

Who this course is for:
  • Beginner and professional Engineer


  • Register New Account
    Reset Password